Executed Projects

  • A020209 - AL RAHA BEACH EAST DEVELOPMENT PUBLIC REALM AND PEDESTRIAN BRIDGES CONSTRUCTION WORKS

    Project Code

    A020209

    Category

    Construction

    Client

    Aldar Properties

    Consultant

    Hyder Consulting Middle East

    Execution Period

    12/27/2015 To 9/30/2017

    Location

    Abu Dhabi

    Features

    A. Public Realm

     

    1. Hard Landscaping Works   

     

    2. Soft landscape works

     

    3. Secondary + tertiary Irrigation (Landscape Irrigation)

     

    4. Landscape accent lighting + associated cabling

     

    5. Street furniture such as bollards, bins, benches, etc

     

    6. Play equipment

     

    7. Play areas and surfacing

     

    8. Shade structures

     

    9. Signage + way finding

     

    10. Operation and Maintenance

     

    11. Remedial Works to existing ARBE Landscape Works

     

    B. Pedestrian Bridge

     

    1. The construction of 2 No’s steel box-girder pedestrian bridges with aluminum cladding, stainless steel balustrade and composite timber walkway crossing canals and walkways

     

    2. Hoarding and Screen Walls

  • 1 0 4 - OPERATION, DEVELOPMENT AND MAINTENANCE FOR LANDSCAPE, IRRIGATION, STORM WATER AND ASSOCIATED INFRASTRUCTURE.

    Project Code

    1 0 4

    Category

    O & M

    Client

    Abu Dhabi Municipality (PRFD)

    Consultant

    Dorsch Holding GmbH

    Project Value

    368,574,872.00 AED

    Execution Period

    12/1/2006 To 12/31/2014

    Location

    Abu Dhabi

    Features

    PROJECT FEATURES:
    1. Public Areas
    2. Asset Survey Work
    3. Storm water Drainage
    4. Gardens
     Old Airport Garden (1&2)
     Zafaran Public Garden
    5. Palaces
     Sheikh Moh’d Bin Zayed Palace Ring Road
    6. Mosque & Clubs
     Old Airport Mosque
     Al Muroor Mosque
     Zayed Sports City
     West 46 Mosque
     West 47 Mosque
     West 48 Mosque
    7. Irrigation Distribution Mains, Automatic Irrigation, Structures and Fittings.
    8. Development of Landscapes

  • 7787 - LANDSCAPE WORKS FOR PUBLIC REALM - STREETSCAPES

    Project Code

    7787

    Category

    O & M

    Client

    Aldar Properties

    Consultant

    Hyder Consulting Middle East

    Execution Period

    8/16/2015 To 6/15/2016

    Location

    Abu Dhabi

    Features

    Scope of work:-

     

    • Hard and soft Landscape and irrigation works for the streetscape works at shams, Reem Island, Abu Dhabi, UAE.

  • KP - KHALIFA PARK

    Project Code

    KP

    Category

    O & M

    Client

    Abu Dhabi Municipality (PRFD)

    Consultant

    Dorsch Holding GmbH

    Project Value

    67,080,792.00 AED

    Execution Period

    12/1/2006 To 12/31/2014

    Location

    Abu Dhabi

    Features

    PROJECT FEATURES:
    1. Development of Soft Landscapes.
    2. Maintenance of Soft Landscape.
    3. Operation and maintenance of Automatic Irrigation Network System.
    4. Operation and maintenance of Aquarium and importing fish stock.
    5. O & M of Passenger train, railway sleepers and hopper cars.
    6. Operation and maintenance of museums and related fields.
    7. O & M of fountains, water features and pump room.
    8. O & E of Building Management Systems, access control system and
    public address system.
    9. Operation and maintenance of children playground areas.
    10. Operation and maintenance of dark ride.
    11. Operation and maintenance of tensile shade structures and buildings.
    12. Operation and maintenance of dark ride.
    13. Operation and maintenance of landscape light fixtures.
    14. Asset survey work.

  • C8 - OPERATION & MAINTENANCE OF LANDSCAPE ASSETS IN AL AIN (C8) Al Haley

    Project Code

    C8

    Category

    O & M

    Client

    Al Ain Municipality

    Consultant

    Al Ain Municipality

    Execution Period

    6/1/2015 To 5/31/2017

    Location

    Al Ain

    Features

    Scope of work:-

     

    • Project Scope of work – Landscaping maintenance as
    • Soft landscape
    • Hardscape
    • Water Features
    • Water Well
    • Pumping Station and reservoir
    • Irrigation Net works –main Line, Sub Main Line and Automatic Irrigation System
    • Park Maintenance
    • Landscape Site maintenance
    • Development Works   

      Scope of work:-

       

    • Project Scope of work
    • Landscaping maintenance as
    • Soft landscape
    • Hardscape
    • Water Features
    • Water Well
    • Pumping Station and reservoir
    • Irrigation Net works –main Line, Sub Main Line and Automatic Irrigation System
    • Park Maintenance
    • Landscape Site maintenance
    • Development Works   

  • Oasis and Aflaj - OPERATION & MAINTENANCE OF OASIS AND AFLAJ IN AL AIN

    Project Code

    Oasis and Aflaj

    Category

    O & M

    Client

    Al Ain Municipality

    Consultant

    SAM Engineering – Consulting Engineer

    Execution Period

    7/1/2013 To 12/31/2017

    Location

    Al Ain

    Features

    PROJECT FEATURES:
    Construction:- Civil & MEP Works
    Repair:- (Water channels, Cannel gate, Boundary Wall, Fences, internal Roads, Manhole, Farm gates
    wells, etc)
    Operating & Maintenance:-
    1- Irrigation and gates
    2- Boundary wall & main gates
    3- Internal roads
    4- Manholes
    5- Concrete & Fiberglass tank
    6- Removal of dead palms
    7- Removal of surplus material
    8- Pump Control panel

  • 202 - OPERATION, IMPROVEMENT AND MAINTENANCE OF IRRIGATION, STORM WATER & LANDSCAPE FOR ABU DHABI MAINLAND

    Project Code

    202

    Category

    O & M

    Client

    Abu Dhabi Municipality (PRFD)

    Consultant

    Parsons International Limited

    Project Value

    167,299,343.00 AED

    Execution Period

    12/1/2006 To 12/30/2015

    Location

    Abu Dhabi

    Features

    PROJECT FEATURES:
    1. Landscape/Plantation of Farms
    2. Asset Survey Work
    3. Storm water Drainage related works
    4. Gardens
     Baniyas Public Garden
     Baniyas Ladies Garden – Automatic Irrigation system
    5. Irrigation Distribution Mains, Structures and Fittings
    6. Development of landscapes

  • 1001 - MISCELLANEOUS PARKS BETWEEN THE HOUSING AREAS IN ABU DHABI

    Project Code

    1001

    Category

    Construction

    Client

    Abu Dhabi Municipality (PRFD)

    Consultant

    Parsons International Limited

    Execution Period

    12/21/2014 To 12/31/2015

    Location

    Abu Dhabi

    Features

    PROJECT FEATURES:
    Construction and Completion of Pocket Parks in Residential Areas in the City of Abu Dhabi Contract 1001 including
    Capital Garden, Baniyas Leading Road Shoulders, Hamad Center, Al Khazna Building and Nominated Places
    by PRFD in Khalifa B and Old Shahama

  • Al Rawda place (phase1) - LANDSCAPE AND IRRIGATION SYSTEM OF AL RAWDA PALACE ENTRANCE -NEW GATE (PHASE 1)

    Project Code

    Al Rawda place (phase1)

    Category

    Construction

    Client

    Al Ain Municipality

    Consultant

    AECOM Middle East

    Project Value

    39,888,274.00 AED

    Execution Period

    3/24/2013 To 5/31/2013

    Location

    Al Ain

    Features

      Demolition & Site Clearance.

      Earth Works.

      Soft Landscape.

       Hard Landscape

      Water Features including Pump Station & Reservoir

      Under Water Ground Reservoir 1500 m3 including Pump Room, control Panel etc

      Potable Water Works

      Non Disruptive Road Crossing

      Irrigation Works including Automatic Irrigation System

      Services – Electrical Cables, Telecommunications etc

  • Al Rawda place (phase2) - LANDSCAPE AND IRRIGATION SYSTEM OF AL RAWDA PALACE ENTRANCE-NEW GATE (PHASE 2)

    Project Code

    Al Rawda place (phase2)

    Category

    Construction

    Client

    Al Ain Municipality

    Consultant

    AECOM Middle East

    Project Value

    39,888,274.00 AED

    Execution Period

    5/31/2015 To 9/15/2015

    Location

    Al Ain

    Features

      Demolition & Site Clearance.

      Earth Works.

      Soft Landscape.

       Hard Landscape

      Water Features including Pump Station & Reservoir

      Under Water Ground Reservoir 1500 m3 including Pump Room, control Panel etc

      Potable Water Works

      Non Disruptive Road Crossing

      Irrigation Works including Automatic Irrigation System

      Services – Electrical Cables, Telecommunications etc

  • 155/2 - LANDSCAPING WORKS BESIDE CYCLE TRACK AT MOHAMED BIN ZAYED CITY

    Project Code

    155/2

    Category

    Construction

    Client

    Abu Dhabi Municipality (PRFD)

    Consultant

    Parsons International Limited

    Execution Period

    9/1/2014 To 1/4/2016

    Location

    Abu Dhbai

    Features

    PROJECT FEATURES:


    Landscaping works beside cycle track at Mohamed Bin Zayed City

  • 444 - IRRIGATION AND LANDSCAPE WORKS AT THE INTERCHANGE (ON ABU DHABI-DUBAI ROAD) AND ALONG SHAHAMA – SAADIYAT FREEWAY, YAS ISLAND.

    Project Code

    444

    Category

    Construction

    Client

    Abu Dhabi Municipality (PRFD)

    Consultant

    Dorsch Holding GmbH

    Project Value

    91,160,901.00 AED

    Execution Period

    8/12/2009 To 2/12/2010

    Location

    Abu Dhabi

    Features

    Scope of Works:

    Works within this Contract comprise all works as indicated on the drawings, the BOQ and described hereinafter:

    Construct of hard and soft landscape at the Yas Island interchange on Abu Dhabi –Dubai Road & along Shahama – Saadiyat Freeway, YAS Island.

    Earthworks including riprap protection.

    Construct the irrigation network and connection point including all irrigation valves, solenoid valves, controllers, etc.

    Site survey for the irrigation pipelines and connection points as shown on the drawings.

    Hydraulic calculations for the irrigation network till pumping station.

    Supply, Installation, commissioning of the following:-

    Main irrigation HDPE pipelines from the existing pumping station including all valve chambers, air valves etc and all work to complete.

    Pipe connection between existing discharge chamber at Pumping Station 94A to the new proposed pipelines.

    Construction of HDPE pipeline in HDD (Horizontal Directional Drilling) method & connection to the new valve chamber.

    Co-ordination with the other contractors working on site.

    Co-ordination with all authorities for all permits, power supply, water supply approval of pipe.

    Operation and maintenance of the irrigation network and landscape works for 90 days after PAC issue.

    Co-ordination with the existing O&M contractor of the existing pumping station.

    Any works related to the above works in any location within project areas, which may be instructed throughout the duration of the Contract.

     

    Reinstatement of all surfaces and/or any existing components/services disturbed or damaged as a result of the construction of this project.

    Any work related to the above works in any location within 50 km of Project Areas, which may be instructed throughout the duration of the Contract.

    The provision of labour, materials, plant, equipment, instruments etc required for the works.

    The testing and commissioning of all works.

    The maintenance of the works for a period of 365 days.

  • 509/11 - LOWERING OF GROUND WATER TABLE OF AL AJBAN FARMS

    Project Code

    509/11

    Category

    Construction

    Client

    Abu Dhabi Municipality (PRFD)

    Consultant

    Parsons International Limited

    Project Value

    31,896,900.00 AED

    Execution Period

    2/15/2009 To 2/12/2010

    Location

    Abu Dhabi

    Features

    PROJECT FEATURES:

    1. General works
    2. Site works
    3. Sub-surface drainage pipeline works
    4. Manhole construction

     

    Scope of Works

     

    The project mainly comprise sub-surface drainage network including drainage pipelines, manholes and associated works. Major works comes under the contract as follow:

    • Construction of approximately 61.30km length of slotted u-PVC drainage pipelines of 110-160mm diameter with their associated end caps and inspection shafts.
    • Construction of approximately 12.80 km length of solid u-PVC drainage pipelines of 160mm to 400mm diameter including associated manholes.
    • All other works, which may be incidental or necessary for the completion of works but are not specified herein, are also to be included.
    • The provision of all materials.
    • Testing and commissioning of all works.
    • The reinstatement of all surfaces distributed or damaged as a result of the construction and / or maintenance of the works.

     

    Location: Al Ajban

  • 484/2 - AGRICULTURAL DRAINAGE WORKS FOR AL WATHBA, AL NAHDA FARMS, AL FAYA AND MISCELLANEOUS WORKS IN ABU DHABI MAINLAND

    Project Code

    484/2

    Category

    Construction

    Client

    Abu Dhabi Municipality (PRFD)

    Consultant

    Dorsch Holding GmbH

    Project Value

    36,989,487.00 AED

    Execution Period

    11/1/2007 To 4/23/2009

    Location

    Abu Dhabi

    Features

    PROJECT FEATURES:

    General works

    Site works

    Subsoil Water, Pipelines

    Subsoil water, Structures

    Pressure Pipelines

    Subsoil Water Pumping Station (Civil)

    Subsoil Water Pumping Station (Mechanical)

    NDM works

    Scope of Works

    Storm water lines including related structures and associated works.

    Subsoil (solid or slotted) drainage including related structures and associated works.

    Construct of Pumping Stations and Motor Control Panels including all Civil and Mechanical/Electrical Works.

    Pressure Pipelines including related structures, valve chambers and associated works.

    Connection of new storm water and subsoil lines to existing networks.

    Work related to abandonment of existing storm water and subsoil lines including related structures.

    Cleaning and flashing of existing storm water and subsoil lines and its related structures.

    NDM works.

    Any works related to the above works in any location within project Areas, which may be instructed throughout the duration of the Contract.

    Reinstatement of all surfaces and/or any existing components/services distributed or damaged as a result of the construction of this project.

    Any other works related to the above works in any location within 100 km of Project Areas, which may be instructed throughout the duration of the Contract.

    The provision of labour, material, plant, equipment, instrument etc. required for the works.

    The testing and commissioning of all works.

    The maintenance of the works for a period of 365 days.

    Location: The work within this Contract is located at Mainland of Abu Dhabi (i.e. Baniyas, Al Wathba, Al Nahda, Al Faya, Al Khatim etc.)

  • 482 - AGRICULTURE DRAINAGE WORKS FOR FOREST GREEN BELT AT AL JARF AREA, PHASE 1

    Project Code

    482

    Category

    Construction

    Client

    Abu Dhabi Municipality (PRFD)

    Consultant

    Dorsch Holding GmbH

    Project Value

    33,947,035.00 AED

    Execution Period

    12/25/2007 To 3/16/2010

    Location

    Abu Dhabi

    Features

    PROJECT FEATURES:

    1. General works
    2. Site works
    3. Subsoil Water, Pipelines
    4. Subsoil water, Structures
    5. Pressure Pipelines
    6. Subsoil Water Pumping Station (Civil)
    7. Subsoil Water Pumping Station (Mechanical)
    8. NDM works

     

    Scope of Works

    • Subsoil (solid or slotted) drainage including related structures and associated works.
    • Construct of Pumping Stations, Generator building and Motor Control Panels including all Civil and Mechanical/Electrical Works.
    • Pressure Pipelines including related structures, valve chambers and associated works.
    • Connection of new storm water and subsoil lines to existing networks.

     

    • Works related to abandonment of existing storm water and subsoil lines including related structures
    • Cleaning and flashing of existing storm water and subsoil lines and its related structures
    • NDM works.
    • Any works related to the above works in any location within project Areas, which may be instructed throughout the duration of the Contract.
    • Reinstatement of all surfaces and/or any existing components/services distributed or damaged as a result of the construction of this project.
    • Any other works related to the above works in any location within 50 km of Project Areas, which may be instructed throughout the duration of the Contract.
    • The provision of labour, material, plant, equipment, instrument etc. required for the works.
    • The testing and commissioning of all works.
    • The maintenance of the works for a period of 365 days.

     

    B. Location: The work within this contract is located at Al Jarf Area

From The Gallery

About Us

GCC, founded in the year 1988, is a name synonymous with innovation and excellence in construction. Our success is exemplified by the sheer breadth of projects accomplished, spanning a wide spectrum right from infrastructure, defense and leisure to industrial, commercial and residential. 

Latest News

  • Gcc is award a big new project at Al Raha beach east development public realm and pedestrian bridges construction works

    + Read more

  • Plantation Week 2014

    + Read more

Contact Us

Copyright © 2015. All rights reserved.