Executed Projects

  • A020307/2018/C/002 - Infrastructure and Landscape Works for asset Handover for Saraya Development, Abu Dhabi

    Project Code

    A020307/2018/C/002

    Category

    Construction

    Client

    Aldar Properties

    Consultant

    Arcadis

    Project Value

    14,750,530.96 AED

    Execution Period

    11/18/2018 To 6/18/2019

    Location

    Abu Dhabi

    Features

    Infrastructure and Landscape Works for asset Handover
    • Ground Investigation
    • Demolition and Site Clearance 
    • Earthworks
    • Roads and paving 
    • Street Lighting Works 
    • Potable Water Works
    • Sewerage Works 
    • Storm water Works 
    • Irrigation Works 
    • Power Works 
    • Telecommunication works 
    • Gas Works
    • Landscaping& Tertiary Irrigation System

  • A430505/2018/C/017 - West YAS Development, YAS Island, Abu Dhabi

    Project Code

    A430505/2018/C/017

    Category

    Construction

    Client

    Aldar Properties

    Consultant

    Dorsch Holding GmbH

    Execution Period

    12/30/2018 To 2/29/2020

    Location

    Abu Dhabi

    Features

    Design and Construction of Landscape Community Park
    • Earth Works
    • Hard Landscaping
    • Soft Landscaping
    • Irrigation
    • Utility Services
    • Landscape Furniture
    • Play & Fitness Equipments
    • Traffic and Park Signage

  • Tender 162/2018 - Landscape Works Around the Interchanges Bridges of Carrefour and Jawazat

    Project Code

    Tender 162/2018

    Category

    Construction

    Client

    Abu Dhabi Municipality (PRFD)

    Consultant

    Parsons International Limited

    Project Value

    7,350,000.00 AED

    Execution Period

    11/1/2018 To 9/30/2019

    Location

    Abu Dhabi

    Features

    Landscape Works Around the Interchanges Bridges of Carrefour and Jawazat
    1. Design Works
    2. Softscape works
    • Removal and disposal of existing landscape works, disposal to ADM designated area or as directed by the Client
    • Construction of mound
    • Supply and install ground covers/plants

    3. Hardscape Works
    • Removal and disposal of existing fountains, disposal to ADM store/ dumping area or as directed by the Client
    • Interlocking / paving tiles including kerb edging
    • Plastic edging
    • Supply and install gravel
    • Construction of separation wall
    • Fencing, boundary walls and railings

    4. Irrigation Works
    • The construction of irrigation pipelines and fittings of various materials and diameters as required.
    • Tie-in connections with the existing network including maintaining the existing system in running conditions.
    • Disconnection and disposal (as directed by Client) of old irrigation networks if required
    • All other works, which may be incidental or necessary for the completion of works.
    • Testing and commissioning.

    5.Lighting Works
    • Supply, installation and commissioning of landscape lightings
    • Supply, installation and commissioning of beatification lightings
    6. Establishment and Nourishment Works

  • A990001/2019/T/860 - Water Proofing Works at Level 03 Souk, WTC Project –Abu Dhabi

    Project Code

    A990001/2019/T/860

    Category

    Construction

    Client

    Aldar Properties

    Consultant

    WS Atkins & Partners

    Execution Period

    4/14/2019 To 11/30/2019

    Location

    Abu Dhabi

    Features

    Water Proofing Works at Level 03 Souk, WTC Project –Abu Dhabi, UAE
    Waterproofing (Planters & Pedestrian Roofs) 
    The main floor forming the works are the Level 03 main circulation areas and the planters. 
    • In addition to the above, repairing of the leaking areas around The GRC Domes and Roof skylights areas 
    • Identify and isolate the MEP services inside the planters such as the irrigation lines, and to carefully dismantle the planter`s drains during excavation time. 
    • The existing drain gutter lines must be removed carefully and reinstated, 
    • Careful removal of the tiles around the drain point in accordance with the WP specialist requirements and to reinstate the cement tile again. 
    • Dismantle the existing timber flooring carefully, store it properly and to reinstate it as it was fixed originally
    • Replacement of damaged material

    Rawaq Restaurant Area 
    • Demolition of the pedestrian roofs down to the structural slab level and floor to be built up again with a new waterproofing system proposed and guaranteed by the waterproofing specialist which align with the existing built up detail used in souk. 
    • The successful tenderer must consider the joint areas between the existing plant rooms and the demolished pedestrian roofs in terms of the waterproofing termination, the two areas WP system must be separated. 
    • Demolition and disposal of the remaining Rawaq Restaurant tenancy

  • ATC-AUH-SC-18-JVA-0008 - Construction and Completion of Show Village & Sales Centre at Khalifa City, Abu Dhabi

    Project Code

    ATC-AUH-SC-18-JVA-0008

    Category

    Construction

    Client

    Modon Properties/ Arabtec

    Consultant

    KEO International Consulting

    Project Value

    5,000,000.00 AED

    Execution Period

    1/16/2019 To 8/30/2019

    Location

    Abu Dhabi

    Features

    Execution of Infrastructure Civil & Mechanical Works for Show Village
    • Ground Investigation
    • Demolition & Site Clearance
    • Earth Work
    • Roads & Paving
    • Storm water & Drainage works
    • Sewerage Works
    • Potable Water Works
    • Street Lighting
    • Telecommunication
    • Irrigation Pumping Stations

  • Safety Improvement Works - Safety Improvement Works at Sheikh Zayed Bin Sultan Road Corniche Al Gurm Mangrove Walk, Abu Dhabi,

    Project Code

    Safety Improvement Works

    Category

    Construction

    Client

    Musanada/ NBHH

    Consultant

    Core/ ICON

    Project Value

    3,686,031.00 AED

    Execution Period

    8/4/2020 To 11/15/2020

    Location

    Abu Dhabi

    Features

    • Irrigation Works
    • Soft Landscaping Works

  • 6578 - Le Royal Meridien – Pool Refurbishment

    Project Code

    6578

    Category

    Construction

    Client

    Le Royal Meridian

    Consultant

    Cracknell

    Project Value

    3,600,000.00 AED

    Execution Period

    8/15/2018 To 10/15/2018

    Location

    Abu Dhabi

    Features

    Swimming Pool Area Landscape Refurbishment Package
    1. The scope of landscape work covers supply, installation of hard & soft landscaping, landscape lighting design, site furnishings, irrigation design, all relating to landscape elements within the extent of work.
    2. Demolition / refurbishment works:
    • Protection to Existing Structures on the site.
    • New Paving finishes to be bonded and laid over existing substrate
    • Removal and relocation of existing minor structures and services in accordance with local authority regulations and to Engineers instructions.
    • Renovation of swimming pool finishes.
    • Demolition and removal of existing walls etc minor elements as indicated.
    • Reuse of existing structures and material as per site conditions
    • Temporarily remove items for the ease of construction and reinstating them, as per the site conditions.
    • If required, changing cover levels of existing services as per site conditions; including but not limited to manholes and storm inlet gulley.
    • Making good damaged walls and other minor components as per site conditions.

  • T10/2018 - Phase-1 Civil & Miscellaneous Works All Fabric Shade Structures Works

    Project Code

    T10/2018

    Category

    Construction

    Client

    Al Ain Zoo

    Consultant

    Gulf Contractors

    Project Value

    2,994,569.33 AED

    Execution Period

    1/6/2019 To 6/6/2019

    Location

    Al Ain

    Features

    Supply and installation of Tensile Shade Fabric Structures in different locations of Al Ain Zoo. Design and Built of Tensile Shade Fabric Structures in different locations in Al Ain Zoo. 
    • Supply and install Shade Fabric Structures at Children Discovery Area at Kid's Demonstration area.
    • Extend the existing shade structure to cover the back side of corridor in Animal Contact Barn (rear side) at CDA
    • Install new shade structure in the service yard to serve as storage for dry grass and husbandry tools at Dog & Hyena holding building yard. (OGW)
    • Fabricate and install new shade structures at the entrance of the Cheetah BOH building. (AMP)
    • Fabricate and install Al Ain Safari Shading for Safari Cars. (PSE)
    • Supply and Install Fabric shade structure over Vervet and Monkey Enclose

  • 6243 - Design, Approval and Construction of GRC Decorative Screen (Mashrabiya Screen) at Louvre Abu Dhabi

    Project Code

    6243

    Category

    Construction

    Client

    Louvre- Abu Dhabi

    Consultant

    Gulf Contractors

    Project Value

    2,492,085.00 AED

    Execution Period

    1/6/2020 To 6/30/2020

    Location

    Abu Dhabi

    Features

    • Design, approval and construction of GRC Decorative Screen (mashrabiya screen) trowel finish back/top side
    • 75mm thick overall
    • inclusive of GRC moulding 85 x 25mm
    • Fixtures to be stainless steel; joints to be treated with PU sealant same as existing. 

  • Shams Bridge Phase 1 & 2 Al Reem Island - Landscape Works Near to Shams Brige-1 & 2 for Shams Street Scape Phase- 1 and Shams Canal Package at Shams on Reem Island in Emirate of Abu Dhabi

    Project Code

    Shams Bridge Phase 1 & 2 Al Reem Island

    Category

    Construction

    Client

    Aldar Properties

    Consultant

    AECOM Middle East

    Project Value

    1,900,000.00 AED

    Execution Period

    11/20/2019 To 5/30/2020

    Location

    Abu Dhabi

    Features

    Remove, evacuate, supply, fix & maintain soft and hard landscape with irrigation in the public area around the bridges project phase 1 & 2. Project Consist of 2 Phases each one contains 3 Residential Buildings including external works. 
    • Site Works
    • Hard Landscaping 
    • Soft Landscaping
    • Concrete and Signage Works 
    • Miscellaneous Works 
    • Irrigation Works

  • Enabling and Infrastructure Works - Jubail Island – Enabling and Infrastructure Works for Mock Up villas

    Project Code

    Enabling and Infrastructure Works

    Category

    Construction

    Client

    Jubail Island Investment Company

    Consultant

    Lead Consultant

    Project Value

    1,839,020.91 AED

    Execution Period

    3/7/2020 To 3/10/2020

    Location

    Abu Dhabi

    Features

    • Irrigation Works
    • Hard Landscaping Works
    • Soft Landscaping Works

  • T-05/2018 - Enhancement of Lighting at UAE-WD and Core Zoo- Phase 1

    Project Code

    T-05/2018

    Category

    Construction

    Client

    Al Ain Zoo

    Consultant

    Gulf Contractors

    Project Value

    1,150,700.00 AED

    Execution Period

    9/1/2018 To 1/31/2019

    Location

    Al Ain

    Features

    Removal and Reinstallation of Lighting in Park. The Scope of work is to enhance the lights in the UAE WD and its connection with the core zoo. 
    • The existing 1 m Bollard lights shall be removed, cleaned and handed over to FM stores, new pole lights same or equivalent to the lights installed in the world desert project shall replace the removed bollard lights.
    • The old foundations shall be removed and new foundations based on the manufacturer recommendations to be constructed at site in the same location of the old foundation including all necessary civil works.

    • The new pole lights shall be installed on the new foundation as per the manufacturer recommendations and international standards. 
    • All electrical connection to be executed using the same power network and connecting cables and provide any necessary connection or panel to guarantee the connectivity and functionality of the system. 

  • T-05/2018 - Enhancement of Lighting at UAE-WD and Core Zoo- Phase 1

    Project Code

    T-05/2018

    Category

    Construction

    Client

    Al Ain Zoo

    Consultant

    Gulf Contractors

    Project Value

    1,150,700.00 AED

    Execution Period

    9/1/2018 To 1/31/2019

    Location

    Al Ain

    Features

    Removal and Reinstallation of Lighting in Park. The Scope of work is to enhance the lights in the UAE WD and its connection with the core zoo. 
    • The existing 1 m Bollard lights shall be removed, cleaned and handed over to FM stores, new pole lights same or equivalent to the lights installed in the world desert project shall replace the removed bollard lights. The specification of the pole lights is attached to this RFP. 
    • The old foundations shall be removed and new foundations based on the manufacturer recommendations to be constructed at site in the same location of the old foundation including all necessary civil works.

    • The new pole lights shall be installed on the new foundation as per the manufacturer recommendations and international standards. 
    • All electrical connection to be executed using the same power network and connecting cables and provide any necessary connection or panel to guarantee the connectivity and functionality of the system. 

  • Nudra Project, Do4 Villa - Nudra Project, Do4 Villa, Saadiyat Island, Abu Dhabi (Mock UP )

    Project Code

    Nudra Project, Do4 Villa

    Category

    Construction

    Client

    IMKAN Properties

    Consultant

    Gulf Contractors

    Project Value

    398,643.40 AED

    Execution Period

    4/1/2020 To 7/25/2020

    Location

    Abu Dhabi

    Features

    Design, supply, install and handover of the D04 villa landscape works.
    • Paving and stepping stones (concrete slab for the pavers excluded but considered for the stepping stones and edges of the pavers)
    • Trees, shrubs, ground cover, lawn
    • Irrigation system
    • Landscape lighting

  • 371 - RELOCATION OF 7 NUMBERS STORM WATER OUTFALLS AND CONSTRUCT SEWERAGE PIPELINES AND PUMPING STATION IN ABU DHABI NEW BEACH

    Project Code

    371

    Category

    Construction

    Client

    Abu Dhabi Municipality (PRFD)

    Consultant

    Hyder Consulting Middle East

    Project Value

    153,000,000.00 AED

    Execution Period

    2/14/2008 To 6/30/2008

    Location

    Abu Dhabi

    Features

    PROJECT FEATURES:

    Hard Landscape Works:

    • Paving of Pre-cast concrete tiles
    • Furniture and fittings
    • Timber board walk
    • Concrete plaza flooring, concrete steps and Landscape wall
    • Children’s play area

    Soft Landscape Works:

    • Planting of Palms, shrubs & ground covers including backfilling
    • Maintenance and after care 360 days

    Irrigation Works

    • Automatic Irrigation networks
    • Maintenance and after care 360 days
    • Irrigation mainline, sub-mainline and lateral

    Building Works:

    • Toilets at beach 7 Nos.
    • Beach Towers 7 Nos.
    • Kiosk at Corniche galleria 2 Nos.
    • Toilets at Corniche Galleria 2 nos.
    • Prayer room at Corniche Galleria 1 No.
    • Maintenance room/ garbage room 1 no.
    • Supply and installation of cables
    • Supply and installation of Portable Water system
    • Supply and installation of Drainage system

    Building

    • Electrical Works
    • Supply and installation of Landscape lights
    • Umbrella lights 170 nos.
    • Up lights to palms 300 Nos.
    • Runway Lights to Board walk 1000 Nos.                                                                               
    • Bollard Lights 1000 nos.
    • Supply and installation of complete electrical system

    Infrastructure Works

    • Storm water pipeline works - Sewerage pipeline works - 7nos. out falls connecting to new line.
    • Underground Pumping station – 2Nos.
    • Construction of Manholes - Odour chamber - MCC room – Inlet

     

From The Gallery

About Us

GCC, founded in the year 1988, is a name synonymous with innovation and excellence in construction. Our success is exemplified by the sheer breadth of projects accomplished, spanning a wide spectrum right from infrastructure, defense and leisure to industrial, commercial and residential. 

Latest News

  • Gcc is award a big new project at Al Raha beach east development public realm and pedestrian bridges construction works

    + Read more

  • Plantation Week 2014

    + Read more

Contact Us

Copyright © 2015. All rights reserved.