A820103/2017/T/002 - Construction Works for Reem Central Park, Shams Abu Dhabi Project Code A820103/2017/T/002 View Details Category Construction Client Aldar Properties Consultant JACOBS/ AECOM Project Value 153,000,000.00 AED Execution Period 11/16/2017 To 10/31/2018 Location Reem Island Abu Dhabi Features • Reem Central Park is part of Reem Island Concept Integrated Master Plan (CIMP) and will form the center of recreation and leisure with Shams development of Reem Island. • The Site covers an area of 78,378m² of land with a length of approximately 200m. The Site is bordered on three sides by residential and commercial towers, and open to the canal and mangroves system of the Abu Dhabi Island on the other. • The project shall consist of a park, retail and mosque. • The park will incorporate a range of amenities, including sports facilities and distinctive features for residents of Shams and visitors alike. The park will enhance the proposed canal and accentuate the beach front promenade. The existing canal structural to the west part of the Site will be demolished and replaced with park land. • The retail development of 7,500 m² GFA will be provided within the close proximity to the beach front with connectivity to the beach, park and mosque. The retail development will have associated parking. The promenade will be predominantly F&B. • Pedestrian Bridges • Tensile Shade Structures • Multi-purpose skate park • Water Features and Plant rooms • Retail and associated external works • Retaining Wall and associated Works • Mosque and associated works • Landscaping Works • Roadworks • Irrigation Network • Potable Water Network • Sewer Network • Storm Water Network • Electrical Network (MV & LV Network) • Street Lighting • Telecom Network Security Network • Ancillary Buildings Hidd Al Saadiyat Villas Development - Hidd Al Saadiyat Villas Development Project Code Hidd Al Saadiyat Villas Development View Details Category Construction Client SAADIYAT DEVELOPMENT AND INVESTMENT COMPANY Consultant Cracknell Project Value 112,000,000.00 AED Execution Period 4/3/2016 To 8/2/2018 Location Hidd Al Saadiyat Abu Dhabi Features Landscape Works, Open space and Streetscape Phase 1 and 2 Streetscape • Irrigation Network • Hard Landscaping Works • Soft Landscaping Works • Street Furniture Works • Electrical Works Openspace • Irrigation Network • Hard Landscaping Works • Soft Landscaping Works • Street Furniture Works • Electrical Works A820102/2015/C/004 - Landscape Works for public Realm – Streetscapes Project Code A820102/2015/C/004 View Details Category Construction Client Aldar Properties Consultant Cracknell Project Value 57,200,000.00 AED Execution Period 8/16/2015 To 6/15/2016 Location Shams, Reem Island, Abu Dhabi Features The scope of work includes hard and soft landscape and irrigation works for the Streetscape works at Shams, Reem Island, Abu Dhabi, UAE • Site Works • Hard Landscaping • Soft Landscaping • Concrete and Signage Works • Miscellaneous Works Including Utility Services, Centre Island Crossings, Cycle Rack • Irrigation Works Landscape Works for Public Realm – Streetscapes– Phase II - Landscape Works for Public Realm – Streetscapes– Phase II Project Code Landscape Works for Public Realm – Streetscapes– Phase II View Details Category Construction Client Aldar Properties Consultant Cracknell Project Value 110,662,137.83 AED Execution Period 7/31/2016 To 1/15/2018 Location Shams, Reem Island, Abu Dhabi Features The scope of work includes hard and soft landscape and irrigation works for the Coastal Scape, Canal Scape, Linera paks, Landscape works at Shams, Reem Island, Abu Dhabi, UAE as indicated in the drawings and contract documents. The works shall include following, as per Engineer's instructions: • Provision of new planting materials, hardscape-softscape materials, Site furnitures, irrigation, Lighting Fixtures with wiring, Toilet and shower blocks, minor infra works • Removal, relocation or raising/lowering of existing services; including but not limited to the existing above and below ground infrastructure • Relocation of existing services; including but not limited to Control cabinets • Changing cover levels of existing services; including but not limited to manholes and storm inlet gulley to match existing and/or proposed levels Al Nareel Development, Abu Dhabi - Al Nareel Development, Abu Dhabi - construction of all infrastructure and ancillary works Project Code Al Nareel Development, Abu Dhabi View Details Category Construction Client Aldar Properties Consultant KEO International Consulting Project Value 45,807,136.08 AED Execution Period 11/1/2016 To 6/30/2018 Location Nareel , Abu Dhabi Features Landscape & Public Realm Works and Secondary Irrigation Network Works • Earth works & site clearing • Sub base & base courses • Secondary irrigation network with Automatic Irrigation System • Softscape Works • Hardscape Works • Waterfeature Works • Shade Structure • Pergola Structure • Signage & Way findings • Landscape Light Fixtures • LV Cable & Termination • Public Art AAM Tender 09/2018 - Rehabilitation and Development of Public Parks in Al Ain Project Code AAM Tender 09/2018 View Details Category Construction Client Al Ain Municipality Consultant Gulf Contractors Project Value 40,000,000.00 AED Execution Period 12/26/2018 To 4/25/2020 Location Al Ain Features Project Description: Rehabilitation and development of parks assets by replacing the damaged ones and enhancing the shortage by adding High quality assets and security and safety considerations in asset selection as well as provision The needs of the community in public places, where the needs of assets in public parks have been studied Project Outcomes: • Provide and replace some garden assets, for example, and not as a limitation: kid’s playgrounds, light poles, Benches, Trash bins, shade structures, water coolers, grills etc..... • Toilets’ establishment and rehabilitation • Fountains Rehabilitation • Pavements replacements • Signboards Project Scope: The project includes public parks in the city of Al Ain, for example, and not as a Algoua Family park Alwagan Family Park- Alwagan Ladies & Kids Park- Alhayer Park- Nahel Park- Alfaqaa Park (old) - Alshuwaib Park (old) - Salamat Park- Northern Yahar Park- Southern Yahar Park- Abu Samra Park - Remah family Park- Al Kazna Park-Umm Ghafa park- Meziad Park- AlDhaher park etc P158 - Cultural District Public Realm, Project No. P158- Phase I Public Realm Main Contract Works Project Code P158 View Details Category Construction Client Tourism Development & Investment Company (TDIC) Consultant KEO International Consulting Project Value 37,900,000.00 AED Execution Period 4/25/2017 To 11/9/2017 Location Abu Dhabi Features The Works can be described as the Phase 1 Public Realm to the Cultural District, Saadiyat Island, which incorporates the approach road that connects the Saadiyat Bridge Expressway and the Louvre Abu Dhabi. The landscape works encompasses all elements but not limited to • Earthworks • Hard Landscape, • Soft Landscape • Landscape Lighting, • Security CCTV • Wayfinding Signage, • Street Furniture • Toilets • Bus Stops • Secondary and Tertiary Irrigation from Existing Mainline Point of Connection • Site Hoardings for Both Construction and Subsequent Maintenance. P390-T/BPS/677/057/18 - Construction of Development and Beautification of the Scene in Front of Sheikh Shakbout Medical City Project Code P390-T/BPS/677/057/18 View Details Category Construction Client Musanada Consultant KN International Project Value 34,182,103.54 AED Execution Period 2/3/2019 To 3/1/2020 Location Abu Dhabi Features The Scope of Works in this project is to improve the appearance in front of the new Sheikh Shakhbout Medical City, including but not limited to Hard landscape and Soft landscape, Street furniture, Cycle track and Sidewalk paving, Storm water drainage, Irrigation networks, Signage and Street lighting Earth works etc. The works of this contract will vary according to the requirements of contract specification and possible work may include the following major items: • Earth works. • Road works (asphalt) and Bicycle track (acrylic paving) works • Soft landscaping. (Palms, Trees, Shrubs, Turfs, Grasses, groundcovers etc.) • Hard landscaping (Unit paving, Tactile paving, Concrete kerb). • Concrete and Signage work. • Irrigation works (Mainline +Secondary+ tertiary irrigation) • Maintenance work in Sewerage & Storm water works. • Installation of Bus shelter & Parking areas. • Telecommunication networks (Etisalat & Du) • Electrical line & Street lighting works. • Street furniture installation works such as Bollards, Bike rack & Litter Bin. • The reinstatement of existing water feature works. SC -YSDP02 -2019 -073 - Yas South Integrated Destination Resort (IDR) – The Family Hotel Project Code SC -YSDP02 -2019 -073 View Details Category Construction Client Sanjose Fibrex JV Consultant LMS International Project Value 25,897,367.75 AED Execution Period 6/26/2019 To 3/31/2021 Location Abu Dhabi Features • Family Hotel & Retail Hardscaping • Family Hotel & Retail Soft Landscaping • Family Hotel & Retail Irrigation System Works Xeriscape and Bike Park - Xeriscape and Bike Park - Hudayriat Island, Abu Dhabi. Project Code Xeriscape and Bike Park View Details Category Construction Client Modon Properties Consultant GHD Project Value 20,574,450.44 AED Execution Period 11/5/2019 To 8/31/2020 Location Abu Dhabi. Features • Soft Landscape • Hard Landscape • Gabion Wall at Resting Nodes • Street Furniture • Landscape Lighting • Wayfinding • Supply and Installation of Road Marking on Asphalt Track • Camp Site Shade Structure - 7.5mX5m • Stage, size 4 x 8m with covered tensile structure • Construction of Ticketing Booth • Artwork & Sculptures • Timber cladding to cycle underpass GH/SC/P93/597 - Landscape Works- Construction of Internal Roads & Infrastructure for 354 Residential Plots in Shakhbout City Project Code GH/SC/P93/597 View Details Category Construction Client Ghantoot / Musanada Consultant Parsons/ Altorath Project Value 15,896,073.44 AED Execution Period 10/4/2019 To 10/31/2021 Location Abu Dhabi Features • Soil Investigation • Hard Landscape Work • Soft Landscape Work • Irrigation Work • Design & Build Cycle Track Shams Gateway Park– Abu Dhabi - Shams Gateway Park– Abu Dhabi Project Code Shams Gateway Park– Abu Dhabi View Details Category Construction Client Aldar Properties Consultant Cracknell Project Value 18,990,000.00 AED Execution Period 8/16/2015 To 11/15/2015 Location Abu Dhabi Features Design & Build Shams Gateway Park– Abu Dhabi • Hardscape • Softscape • Street Furniture • lrrigation • Electrical and Lighting Works • Demolition works • Sewerage and water supply Infrastructure • Toilet and Shower Block • Signages and Wayfindings A322201/2019/T/007 - Design & Build Initial Landscape Works for Mamsha and Extension of Boulevard Project Code A322201/2019/T/007 View Details Category Construction Client Aldar Properties Consultant Cracknell/ Parsons Project Value 18,250,870.16 AED Execution Period 4/21/2019 To 1/20/2020 Location Abu Dhabi Features Design & Build Initial Landscape Works for Mamsha and Extension of Boulevard • Soft landscape works • Hard landscape • Irrigation Lateral Pipe Works - UPVC Al Merief Development, Abu Dhabi - Al Merief Development, Abu Dhabi - construction of all infrastructure and ancillary works Project Code Al Merief Development, Abu Dhabi View Details Category Construction Client Aldar Properties Consultant KEO International Consulting Project Value 51,018,208.00 AED Execution Period 11/1/2016 To 6/30/2018 Location Abu Dhabi Features Landscape & Public Realm Works and Secondary Irrigation Network Works • Earth works & site clearing • Sub base & base courses • Secondary irrigation network with Automatic Irrigation System • Softscape Works • Hardscape Works • Shade Structure • Pergola Structure • Signage & Way findings • Landscape Light Fixtures • LV Cable & Termination • Public Art Contract No: 102/1S - Operation and Maintenance for Sheik Zayed Street, Meena Road, Ganeva Clock and the Associated Fountain Project Code Contract No: 102/1S View Details Category O & M Client Abu Dhabi Municipality (PRFD) Consultant Abu Dhabi Municipality Project Value 1,806,071.40 AED Execution Period 3/1/2019 To 2/28/2020 Location Abu Dhabi Features Operation and Maintenance for Sheik Zayed Street, Meena Road, Ganeva Clock and the Associated Fountain on Abu Dhabi Island- North East • Hard Landscape Work • Soft Landscape Work • Irrigation Work • Operation & Maintenance of hardscape & Electromechanical component and elements of Geneva Clock & the associated fountain • Pedestrian and Decorative Lighting Page 1 of 6 123456