PD/CA/BPS/SY/R1143/P416-2018-ADM/19/12 - (J-969) Constructions of Roads and Infrastructure in Mohamed Bin Zayed City, Zone – B Stage-2 (B5 & B6) Project Code PD/CA/BPS/SY/R1143/P416-2018-ADM/19/12 View Details Category Construction Client Musanada/ Copri Consultant Core Project Value 6,079,791.74 AED Execution Period 12/8/2021 To 1/31/2022 Location Mohamed Bin Zayed City, Abu Dhabi Features Landscape and Irrigation for Internal Streets & Boulevards and Avenues • Soft Landscaping • Hard Landscaping • Furniture and Structures • Irrigation Networks • Maintenance PD/CA/BPS/SP/R1097/P416-2018-ADM/18/158 - Construction of Roads & Infrastructure for Mohammed Bin Zayed City Zone B Project Code PD/CA/BPS/SP/R1097/P416-2018-ADM/18/158 View Details Category Construction Client Musanada/ Etihaad Emirates Mabani Consultant ITALCO Project Value 56,806,329.64 AED Execution Period 9/7/2021 To 1/31/2022 Location Mohammed Bin Zayed City, Abu Dhabi Features Landscape and Irrigation for Internal Streets & Boulevards and Avenues • Soft Landscaping • Hard Landscaping • Furniture and Structures • Irrigation Networks • Maintenance • Package B2, B3 & B4-Foot Path Works • Cycle Track ADGM & LRT - Abu Dhabi Global Market South Plaza & LTR Park in Al Maryah Island Project Code ADGM & LRT View Details Category Construction Client Mubadala Consultant Cracknell Project Value 30,000,000.00 AED Execution Period 2/7/2021 To 12/31/2021 Location Al Maryah Island, Abu Dhabi Features The ADGM South Plaza and LRT Park project scope includes 2 Packages. Package 1 is for the redevelopment of the ADGM South Plaza to cater for public events and Package 2 is for the implementation of temporary public realm improvements associated with the Highline (LRT Line) between the Park & South-Central Plaza in Al Maryah Island. The projects are both high visibility public realm/landscaping projects and are located on the podium deck at level 14.5m. The two projects ADGM South Plaza and LRT Park are described in the following Sections. Package 1: ADGM South Plaza The first stages of the construction are to demolish select elements of the existing plaza which needs to be handled with care as the surround paving will remain and shouldn’t be damaged. Careful consideration must be taken in the construction phasing of the works to maintain pedestrian and vehicular building access at all times. Given the importance of the plaza and surrounding buildings visual screening of construction works must be maintained through out the entire construction program. The key elements in the new ADGM South Plaza design are: • Sculptural pre-cast seating elements - movable • Sculptural pre-cast planters - movable • Recessed flagpole locations • Smartpole lights • In-ground power points for events at the Plaza level • Power distribution from the South Car Park P1 level (+3.00 LVL) to the Plaza level (+14.5 LVL) • Replacing 3 no. fire hydrants with recessed fire hydrants. • Smoking Zone • Planting • Irrigation Package 2: LRT Park The LRT Park is a temporary public realm space that utilizes the as-built LRT structural tray owned by DMT-DOT. Mubadala have an MOU with DMT-DOT to use the assets until such time that the LRT is implemented. As the MOU agreement includes the requirement to return the asset in the same condition as it was received the design strategy incorporates the use modular elements that can be easily placed and removed while not impacting the LRT structural tray. The LRT Park design is made up of a series of modular planters and seating elements which includes the following key items: • Pre-cast Seating • Pre-cast Planter • Lighting • Signage • Hoarding • Planting • Irrigation • Hardscape • Hoarding Makers District Project - Development of the Pixel Project within Makers District, Reem Island, Abu Dhabi, UAE, Sector R-4/ADM Plot C2 (Plot V-01) Project Code Makers District Project View Details Category Construction Client IMKAN Properties Consultant Ramboll Project Value 22,175,602.00 AED Execution Period 2/15/2021 To 12/31/2021 Location Reem Island, Abu Dhabi Features Public Realm construction works for the entire Makers District development. Public Realm Works is comprised of: • Hardscaping / Paving • Softscaping, including trees and ground cover • Water Features • Secondary Irrigation • Site Furniture, Lighting & Tree Covers Reem Central Park Mosque - Construction of Reem Central Park Mosque Project Code Reem Central Park Mosque View Details Category Construction Client Aldar Properties Consultant JACOBS/ AECOM Project Value 28,000,000.00 AED Execution Period 9/6/2019 To 12/31/2021 Location Reem Island, Abu Dhabi Features Construction of Reem Centeral Park Mosque Mosque • Substructure • Superstructure • Internal Walls and Partitions • Internal Doors • Internal Finishes • Fittings, Furnishing and Equipment • MEP Services Minaret • Substructure • Superstructure • Internal Finishes • Services • Fittings, Furnishing and Equipment External Works • Earthworks • Roads & Paving • Site Furnitures, Signages & Way finding • Services Contract No: MZ 205 - Operation and Maintenance of Soft Landscape and Local Irrigation Networks in Areas Related to Zayed City Municipal Range Project Code Contract No: MZ 205 View Details Category O & M Client Abu Dhabi Municipality (PRFD) Consultant Dorsch Holding GmbH Project Value 55,498,787.52 AED Execution Period 5/2/2019 To 7/31/2023 Location Mohammed Bin Zayed City, Abu Dhabi Features Landscape, Play Area, Local Irrigation Network and Electro Mechanical Maintenance of • Al Raha Residential Development Landscape Works (136nos. Villas) • Mohammed Bin Zayed City Landscape Work Surrounding Cycle Track • Watani Residential Development Landscape Works - Phase 1 • Watani Residential Development Landscape Works - Phase 2 • Mohammmed Bin Zayed City Gardens -Z5, Z6, Z19, Z21 & Khalifa City Gardens -SE36 • Shakhbout City and Mohammed Bin Zayed City • Remedial Works