Project Code 969 Category O & M Client Abu Dhabi Municipality (PRFD) Consultant Parsons International Limited Project Value 25,500,000.00 AED Execution Period 3/1/2010 To 8/18/2013 Location Abu Dhabi Features The nature of work may vary according to requirements of each work order. Possible works under the following major items; Construction of Hard and Soft Landscape Works and Irrigation Systems as instructed in the work order. Construction of storm water drainage gravity pipelines of various materials/diameters. Certain length may be constructed by non-disruptive methods. The construction of pressure pipelines of 100mm to 400mm diameter. Certain lengths may be constructed by non- disruptive methods. Construction of valve chambers, thrust blocks, and all associated works required to make the force mains complete as instructed by the Work order. Abandonment and demolition of existing works. The provision of all materials. Miscellaneous works. Testing Commissioning of all works. Maintenance of the works for a period of 365 days. ×