Scope of Works:
Works within this Contract comprise all works as indicated on the drawings, the BOQ and described hereinafter:
Construct of hard and soft landscape at the Yas Island interchange on Abu Dhabi –Dubai Road & along Shahama – Saadiyat Freeway, YAS Island.
Earthworks including riprap protection.
Construct the irrigation network and connection point including all irrigation valves, solenoid valves, controllers, etc.
Site survey for the irrigation pipelines and connection points as shown on the drawings.
Hydraulic calculations for the irrigation network till pumping station.
Supply, Installation, commissioning of the following:-
Main irrigation HDPE pipelines from the existing pumping station including all valve chambers, air valves etc and all work to complete.
Pipe connection between existing discharge chamber at Pumping Station 94A to the new proposed pipelines.
Construction of HDPE pipeline in HDD (Horizontal Directional Drilling) method & connection to the new valve chamber.
Co-ordination with the other contractors working on site.
Co-ordination with all authorities for all permits, power supply, water supply approval of pipe.
Operation and maintenance of the irrigation network and landscape works for 90 days after PAC issue.
Co-ordination with the existing O&M contractor of the existing pumping station.
Any works related to the above works in any location within project areas, which may be instructed throughout the duration of the Contract.
Reinstatement of all surfaces and/or any existing components/services disturbed or damaged as a result of the construction of this project.
Any work related to the above works in any location within 50 km of Project Areas, which may be instructed throughout the duration of the Contract.
The provision of labour, materials, plant, equipment, instruments etc required for the works.
The testing and commissioning of all works.
The maintenance of the works for a period of 365 days.